![]() The entry/exit to Station Square from Lennox Street may be closed to traffic in both directions only during construction of this section during night works.Ellena Street will remain open during the night works with a left in and left out arrangement for Ellena Street being put in place.A cut and cover arrangement will be put in place with Lennox Street being re-opened to two-way traffic during the day Lennox Street, between Ellena Street and Alice Street will operate at night under a one lane, one-way traffic arrangement with traffic travelling in a southerly direction at night. ![]() Lennox Street between Ellena Street and Alice Street, Maryborough July 2023 to mid-2024 (weather permitting) In addition to the above changed traffic conditions, to allow for the final asphalt resurfacing of Grevillea Street, Grevillea Street at the Boundary Road intersection will be fully closed for a period of approximately five (5) days during the June/July school holidays. Please note that once the works in Boundary Road between Denmans Camp Road and Maree Street have been completed, Boundary Road will be re-opened to two-way traffic. Colyton Street and Tavistock Street – the existing two-way detour arrangements will remain in Colyton Street and Tavistock Street.Beth Street – a two-way traffic arrangement will be maintained in Beth Street, however residents will be unable to turn left into Denmans Camp Road.Maree Street north bound will be closed at Boundary Road however, two-way resident only access on Maree Street will be maintained. Maree Street - A one way/one lane traffic arrangement with traffic travelling in a southerly direction will be implemented.The section of Denmans Camp Road from Colyton Street to Cupania Way will be maintained with a two-way traffic flow. Denmans Camp Road - A one way/one lane traffic arrangement with traffic travelling in a northerly direction will be implemented.Please note that Variable Message Signs will be put in place indicating the July commencement date of these changes once the Contractor has confirmed this date: To allow for road and drainage works in Boundary Road to continue and for works to commence in Denmans Camp Road in conjunction with the Boundary Road Extension project the following traffic arrangements will be put in place in July 2023 to mid-2024, weather and material supply permitting. To allow for the completion of road and drainage works as part of the Boundary Road Extension project. The intersections of Denmans Camp Road and Boundary Road and Boundary Road and Tavistock Street will remain open whilst the works are being completed.Ī detour via Denmans Camp Road, Colyton Street and Tavistock Street will be put in place whilst the works are being completed.Īpproximately 13 weeks (weather permitting) Please check the Disaster Dashboard for ALL road closures due to flooding, hazards or roadworks.įor closures due to Council works in you local area: Dateīoundary Road (between Tavistock Street and Denmans Camp Road, Kawungan
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |